From damaged floor to heavy-duty polyurethane screed
The worn original surface was removed before the concrete was diamond ground and prepared for the new Pumadur HF system.
Food processing flooring case study · Ebbw Vale
Superior Resin Solutions refurbished 120m² of flooring for Express Contract Drying Ltd in Ebbw Vale, South Wales. The project included removal of the damaged original floor, diamond grinding, installation of a 6–9mm Resdev Pumadur HF heavy-duty polyurethane floor screed, 55 linear metres of coving and a 600mm RAL 3001 red perimeter band. The complete package was delivered in three days.
In December 2022, Superior Resin Solutions completed this flooring refurbishment for Express Contract Drying Ltd at its Ebbw Vale facility.
The existing floor was damaged and stained and needed to be removed before the replacement system could be installed. Once the old flooring was taken up, the concrete beneath was found to be in reasonably good condition.
The exposed substrate was mechanically prepared by diamond grinding before the new flooring build-up began.
The project required a hard-wearing hygienic floor suitable for the operating conditions around food-processing equipment. SRS installed a 6–9mm Resdev Pumadur HF heavy-duty polyurethane floor screed in RAL 3001 red, together with hygienic coving and the coordinated perimeter detail.

The photographs show the floor before refurbishment and the finished polyurethane screed after removal, mechanical preparation and installation.
The worn original surface was removed before the concrete was diamond ground and prepared for the new Pumadur HF system.
The new floor was installed around the existing drainage detail to maintain a consistent finish across the processing area.
The build-up combined removal of the old floor, diamond grinding, priming, heavy-duty polyurethane screed, resin coving and perimeter detailing.
The damaged and stained original flooring was removed so the concrete substrate could be exposed and assessed.
The concrete was found to be in reasonably good condition and was mechanically prepared by diamond grinding before the new flooring build-up.
The prepared substrate was primed before installation of the 6–9mm Resdev Pumadur HF polyurethane floor screed in RAL 3001 red.
Resdev Pumadur HF
Approximately 55 linear metres of resin coving were installed, with a 600mm red band applied to the surrounding cladding to complete the room perimeter.
The programme covered removal, mechanical preparation, priming, polyurethane screed installation, coving and the red perimeter detail.
The damaged and stained existing floor was removed to expose the concrete beneath.
The exposed concrete was mechanically diamond ground to provide the prepared surface required for the new system.
The floor was primed before installation of the 6–9mm RAL 3001 Resdev Pumadur HF polyurethane screed.
The coving and coordinated red cladding band completed the food-processing area refurbishment.
The finished RAL 3001 Pumadur HF surface created a clean, robust floor around the processing equipment, drainage and room perimeter.
The processing area received a complete heavy-duty polyurethane flooring refurbishment.
Approximately 55 linear metres of resin coving completed the room perimeter detail.
Removal, preparation, polyurethane screed installation, coving and detailing were completed in three days.
Following the original project, SRS has continued completing further flooring works for the client, typically two to three times each year.



Express Contract Drying Ltd · Ebbw Vale
Ongoing repeat flooring works following the original project
Established repeat SRS client
Explore the SRS services most closely related to this polyurethane screed project.
The project covered approximately 120m² within the Express Contract Drying production facility in Ebbw Vale.
Superior Resin Solutions installed Resdev Pumadur HF heavy-duty polyurethane floor screed at approximately 6–9mm in a RAL 3001 red finish.
The system was selected around the hygiene requirements of the food-processing area, hot-water temperatures generated by the machinery, chemical exposure and the need for a durable long-term flooring solution.
The damaged and stained existing floor was removed. The concrete beneath was in reasonably good condition and was mechanically prepared by diamond grinding before priming and polyurethane screed installation.
Approximately 55 linear metres of resin coving were installed around the processing area.
A 600mm-high RAL 3001 red band was applied to the surrounding cladding to complement the new floor and coving.
The complete flooring package was delivered in three days, including removal, diamond grinding, priming, Pumadur HF installation, coving and perimeter detailing.
Yes. Following the original December 2022 project, SRS has continued completing further flooring works for the client, typically returning two to three times each year.